Lean | TPM for Lean Factory | Standard Work: An Essential building block of a Lean Factory | Lean Transaction | JIT (Just-In-Time) | Lean Management: the Management for Waste-free Production | SMED (Single Minute Exchange of Die) | 5S | Visual Control | Poka Yoke | Lean Manufacturing Diagnosis |Six Sigma | Lean Six Sigma (LSS) Leadership and Coordinator Training | Easy Six Sigma | DOE (Design of Experiment) | MSA (Measurement System Analysis) | SPC (Statistical Process Control) | DOE Training and Follow-up | ANOVA by MINITAB and SPSS | Cost Reduction| Effective Cost Reduction Technique | Strategic Cost Reduction | Maintenance Cost Reduction | VA / VE (Value Amalysis / Value Engineer) |Productivity and IE (Industrial Engineering) Technique| Productivity Tools and Technique | Practical IE for Manager | VA / VE (Value Analysis / Value Engineering) | Project Management | Process Management |TQM| TQM in Action |Other| Total Energy Conservation | Bottom-up Activity: The way to have total participation | Safety |