Lean Manufacturing

TPM for Lean Factories: Reducing Waste Through Lean Thinking

A pull system built on unreliable equipment becomes a system that stops frequently.

TPM Consulting Service Updated 9 min read

Executive summary

  • Lean needs predictable time; TPM is what makes time predictable.
  • Naming the wastes is training. Pricing them per year is consulting.
  • Inventory is the waste that hides all the others.
  • SMED on the two most frequent changeovers usually returns more capacity than new equipment.
  • Standard work is the only mechanism that holds a gain in place.

TPM is often deployed alongside supporting activities that add capability: 5S, visual control, Poka-Yoke and industrial engineering techniques. All of them reduce waste in production, which is another route toward waste-free production.

DefectsOverproduction WaitingTransport InventoryMotion Extra processingUnused talent Quantify each waste in currency per year before choosing the elimination sequence.
Figure 1. The eight wastes. The eighth (unused talent) determines whether the other seven stay eliminated.

Why lean needs TPM

Lean rests on predictable time. Pull systems, small lots and low buffers all assume the machine runs when it is called. An unexpected breakdown stops a system deliberately designed to be thin. Conversely, TPM done without looking at the whole flow produces high availability on assets that are not the constraint.

Walk the material, not the organisation chart

A waste walk follows one product through the entire process, from receipt to dispatch, recording every occasion the material waits, moves, is inspected, is reworked, or is handled without its form or function changing. Waste concentrates at handovers: between shifts, between departments, and between the planning system and the floor.

Attack changeover before you attack the machine

  1. Video the full changeover From last good part to next good part, including the walking and the searching. The video is the data, not the memory of it.
  2. Separate internal from external Anything doable while the machine runs is external.
  3. Convert internal to external Pre-staged tooling, pre-heated dies, kitted fasteners, prepared paperwork.
  4. Streamline the remainder Quick-release fittings, standardised heights, colour-coded settings, and adjustment eliminated by centre-lining.
  5. Standardise and train Write the new sequence as standard work with a role per person, then run it under observation until it holds on every shift.

Where there is no standard, there can be no improvement, only change.

This topic sits in the individual improvement pillar. For help applying it in your plant, see in-house training.

Common questions

Which activities usually run alongside TPM?

5S, visual control, poka-yoke and industrial engineering techniques. All of them reduce waste in production.

Why does lean need TPM?

Lean rests on predictable time: pull systems, small lots and low buffers all assume the machine runs when called, so an unexpected breakdown stops a system designed to be thin. TPM done without looking at the whole flow gives high availability on assets that are not the constraint.

What is a waste walk?

Following one product from receipt to dispatch and recording every time the material waits, moves, is inspected, is reworked, or is handled without its form or function changing. Waste concentrates at handovers.

How do we cut changeover time?

Video the full changeover, separate internal from external work, convert internal work to external, streamline the remainder, then standardise and train until it holds on every shift.

References

  • Nakajima, Seiichi. Introduction to TPM: Total Productive Maintenance. Productivity Press, 1988.
  • Sekine, Kenichi and Arai, Keisuke. TPM for the Lean Factory. Productivity Press, 1998. Thai translation by Thanee Aumor (E.I. Square, 2010).

Request a Plant Assessment

Start with a measured picture of your losses.

A three man-day assessment ends with a readiness report, the weaknesses needing urgent attention, and a TPM plan.

Request a Plant Assessment Inquire for the full 384-page book