TPM Consulting

One-day Plant Walk

One day in your plant, and a written note of what was found. No large commitment before you have seen him work.

What we do best is see what a plant has stopped noticing: the leak nobody reports, the sound that changed, the short stop the operator has learned to clear himself. Together those are capacity lost on every shift.

The day is not a sales visit. It is a walk of the real floor with your team, followed by a straight account of what was found, what to fix first, and which items your own people can handle without hiring anyone.

What the day covers

  • An opening meeting with management and supervisors, about an hour
  • A walk of the line with your production and maintenance people
  • A look at whatever downtime and defect data already exists
  • A verbal summary to your team before we leave
  • A written findings note within a week, with the work ranked in order

Who it suits

  • Plants that know something is wrong but not yet where
  • Plants that ran TPM once and watched it fade
  • Plants considering buying a machine to add capacity
  • Managers who want to see how we work before committing to a programme

After the visit

You end the day with a usable report whether or not anything else follows. If a programme does follow, the fee for the visit is deducted from it.

Arrange a plant walk

Common questions

What happens on the one-day plant walk?

An opening meeting with management and supervisors of about an hour, a walk of the line with your production and maintenance people, a look at the downtime and defect data you already have, a verbal summary before leaving, and a written findings note within a week.

Is it a sales visit?

No. You end the day with a usable report whether or not anything else follows.

Is there a fee?

Yes, the plant walk is a paid visit. If a programme follows, its fee is deducted from the programme.

What should we prepare?

Access to the floor, the production and maintenance people who run the line, and whatever downtime and defect records exist. They do not need tidying first.

Can you visit plants outside Bangkok or in neighbouring countries?

Yes. The work covers all of Thailand and neighbouring Southeast Asian countries. Arrange a date on 089-994-5347 (Monyawan) or at admin@tpmconsulting.org.

On the floor

Walking the line with client engineering and maintenance teams.

Walking the plant with the engineering and maintenance team
Walking the plant with the engineering and maintenance team
Production and maintenance team after training at the PepsiCo (Lay's) plant, Lamphun
Production and maintenance team after training at the PepsiCo (Lay’s) plant, Lamphun
A workshop session with a client team
A workshop session with a client team

Start with a measured picture of your losses.

A three man-day assessment ends with a readiness report, the weaknesses needing urgent attention, and a TPM plan.

Request a Plant Assessment Inquire for the full 384-page book