English Version / TPM Concepts and Literature Review / Bibliography
Bibliography
Ames, V. A. (1996). Implementing the Complete TPM Process. SEMATECH TPM/OEE Case Study Workshop, Tempe, AZ, SEMATECH.
Ames, V. A. (2003). TPM Interview. T. Pomorski. Austin, Tx.
Asaka, T. and K. Ozeki (1990). Handbook of Quality Tools, The Japanese Approach. Cambridge, MA ,Productivity Press.
Bahrani, A. (1995). TPM Management. SEMATECH TPM/OEE Case Study Workshop, Austin, TX, SEMATECH.
Bamber, C. J., J. M. Sharp, et al. (1999). “Factors Affecting Successful Implementation of Total Productive Maintenance: A UK Manufacturing Case Study Perspective.” Journal of Quality in Maintenance Engineering 5(3): 162-181.
Ben-Daya, M. (2000). “You May Need RCM to Enhance TPM Implementation.” Journal of Quality in Maintenance Engineering 6(2): 82-85.
Blanchard, B. (1997). “An Enhanced Approach for Implementing Total Productive Maintenance in the Manufacturing Environment.” Journal of Quality in Maintenance Engineering 3(2): 69-90.
Bosman, H. (2000). “TPM Activities Toward Winning the World Class Award.” JIPM TPM 16: 4-7.
Cooke, F. L. (2000). “Implementing TPM in Plant Maintenance: Some Organisational Barriers. ”International Journal of Quality and Reliability Management 17 (9): 1003-1016.
DiIorio, S. and T. Pomorski (2003). SEMI Equipment Performance and Productivity Measurement Methods, Algorithms, and Standards. Brooks-PRI Automation Asia User Conference 2003, Shanghai.
Elliott, G. (2001). Achieving Manufacturing Excellence. Industrial Management: 7.
Ford, J., J. Kubicek, et al. (2000). SCANDOS= Safety #1 + CANDOS (5S): Engaging the Workforce. 11th Total Productive Maintenance Conference, Dallas, TX, Productivity, Inc.
Funahashi, K. (1998). “Activities Combining 'Energy Saving' and 'Environment'.” JIPM TPM 6: 2-4.
Gardner, L. (2000). Continuous Improvement through 100% Workforce Engagement. 11th Annual Total Productive Maintenance Conference and Exposition, Dallas, Productivity, Inc.
Gardner, L. (2003). TPM Interview. T. Pomorski. South Portland, ME.
Hall, J. (2003). TPM Interview. T. Pomorski. Phoenix.
Hartmann, E. (1992). Successfully Installing TPM in a Non-Japanese Plant. Pittsburgh, PA, TPMPress, Inc.
Heinrich, H. W. (1980). Industrial Accident Prevention: A Safety Management Approach. New York, McGraw-Hill.
Hino, T. (1998). “Method of Evaluating Losses from Stoppages Due to Failures for the Purpose of Measuring the Effect of Maintenance.” JIPM TPM 4: 11-15.
Horner, M. (1996). Analysis of Total Productive Manufacturing Teams in Semiconductor Manufacturing Organizations. Denton, TX, University of North Texas.
Hoshino, H. (2000). TPM for Semiconductor Development Prototyping Line to Achieve Ultra ShortLead Time. JIPM TPM. 20.
Howren, M. (1999). Implementing CANDOS to Change the Culture and Prepare for Autonomous Maintenance. 10th Total Productive Maintenance Conference, Las Vegas, NV, Productivity, Inc.
Ichikawa, A. (1999). “How to Incorporate New Environmental Management Problems in TPM Activities.” JIPM TPM 10: 13-15.
Inoue, H. (1998). “TPM is a Weapon Speeding Up the Construction of an ISO System.” JIPM TPM 5:8-11.
International_SEMATECH (2003). International SEMATECH web page, International SEMATECH.
Ireland, F. and B. G. Dale (2001). “A Study of Total Productive Maintenance Implementation.”Journal of Quality in Maintenance Engineering 7(3): 183-191.
Jackson, T. (1999). Make TPM Part of Your Business Improvement Strategy. Productivity TPM Report: 4-5.
Japan_Institute_of_Plant_Maintenance, Ed. (1996). TPM Total Productive Maintenance Encyclopedia. Tokyo, Japan Institute of Plant Maintenance.
Juhl, K. (2003). A “Visual Factory" Utilizing FACTORY works Data. Brooks Automation Worldwide Automation Symposium, Phoenix, Brooks Automation.
Koike, C. (1998). “Creation of 'Ideal Production System' Through Combination of TPM and ISO.”JIPM TPM 5: 3-7.
Komatsu, M. (1999). “What is Autonomous Maintenance.” JIPM TPM 12: 2-7.
Labib, A. W. (1999). Performance Measures for World Class Maintenance. Flexible Automation and Intelligent Manufacturing: Ninth International FAIM Conference, Tilburg University, The Netherlands, Begell House, Inc.
Lawrence, J. L. (1999). “Use Mathematical Modeling to Give Your TPM Implementation Effort anExtra Boost.” Journal of Quality in Maintenance Engineering 5(1): 62-69.
Lawrence, J. L. (1999). “Use Mathematical Modeling to Give Your TPM Implementation Effort an Extra Boost.” Journal of Quality in Maintenance Engineering 5(1): 62-69.
Leflar, J. (1999). TPM at Hewlett-Packard. 10th Total Productive Maintenance Conference, LasVegas, NV, Productivity, Inc.
Leflar, J. (2000). Achieving Precision Maintenance. 11th Total Productive Maintenance Conferenceand Exposition, Dallas, TX, Productivity, Inc.
Leflar, J. (2001). Practical TPM. Portland, OR, Productivity Press.
Leflar, J. (2003). TPM Interview. T. Pomorski. Fort Collins, CO.
Liker, J. K. (1998). Introduction: Bringing Lean Back to the USA. Becoming Lean: Inside Stories of U. S. Manufacturers. J. K. Liker. Portland, OR, Productivity Press.
Maggard, B. N. and D. M. Rhyne (1992). “Total Productive Maintenance: A Timely Integration of Production and Maintenance.” Production and Inventory Management Journal 33(4): 6-10.
McCloud, M. (1998). “TPM Saves Eastman Chemical $16 Million Per Year.” TPM Report 9(2): 1-5.
McKone, K. E., R. G. Schroeder, et al. (1999). “Total Productive Maintenance: A contextual View. ”Journal of Operations Management 17: 123-144.
Mika, D. (1999). “Former President of TI-Philippines Offers Lessons Learned Implementing TPM. ”TPM Report 9(5): 5-7.
Moubray, J. (1991). Reliability Centered Maintenance. Oxford, England, Butterworth-Heinemann. Nakajima, S. (1984). Introduction to TPM: Total Productive Maintenance. Cambridge, MA,Productivity Press.
Nakajima, S. (1988). Introduction to Total Productive Maintenance. Cambridge, MA, ProductivityPress.
Nakajima, S. (1989). TPM Development Program: Implementing Total Productive Maintenance. Portland, OR, Productivity Press.
Nakajima, S. (2000). The Lean-TPM Connection. The Lean Manufacturing Advisor: 7-10.
Nishinaga, H. (1999). “Construction of a System for Efficient Predictive Maintenance.” JIPM TPM 11:13-16.
Nowlan, S. F. and H. F. Heap (1978). Reliability Centered Maintenance. San Francisco, United AirLines.
Ohno, T. (1988). Toyota Production System. Portland, OR, Productivity Press.
Ohno, T. (1998). “Achieving Continuous Improvement of ISO Through TPM Activities.” JIPM TPM 6: 17-20.
Patterson, J. W. and L. D. Fredendall (1995). “Total Productive Maintenance Is Not for This Company.” Production and Inventory Management Journal 35(2): 61-64.
Patterson, J. W., L. D. Fredendall, et al. (1996). “Adapting Total Productive Maintenance to Asten, Inc.” Production and Inventory Management Journal 37(4): 32-37.
Pomorski, T. (1996). Total Productive Manufacturing in Class 100 5" Photo. SEMATECH TPM/OEE Case Study Workshop, Tempe, AZ, SEMATECH.
Pomorski, T. (1997). Japan Institute of Plant Maintenance Module B - TPM Instructor Course Trip Report. South Portland, ME, Fairchild Semiconductor.
Pomorski, T. (1998). Introduction to Total Productive Manufacturing (TPM) Short Course. South Portland, ME, Fairchild Semiconductor.
Pomorski, T. (2002). Applying Sociotechnical Systems (STS) Theory to Advanced Manufacturing Operations. Cincinnati, OH, Union Institute and University.
Pomorski, T. (2002). Change Management for Organizational Continuous Improvement: Literature Review. Cincinnati, OH, The Union Institute and University.
Pomorski, T. (2002). Lean Manufacturing: Concepts, History, and Literature Review. Cincinnati, OH,The Union Institute and University.
Pomorski, T. (2002). Learning Organizations: Concepts, Practices, and Literature Review. Cincinnati, OH, The Union Institute and University.
Productivity, Inc. (1998). “Aeroquip INOAC Co. Drives OEE Rates Higher Through Systematic Improvement Efforts.” TPM Report 8 (6): 1-8.
Productivity, Inc. (1998). “Phillips 66 and Vistreon Emphasize Recognition Over Rewards.” TPM Report 8 (10): 4-6.
Productivity, I. (1999). 5S for TPM - Supporting and Maintaining Total Productive Maintenance: Participant Guide. Portland, OR, Productivity, Inc.
Productivity, Inc. (1999). “New 5-Phase Plan Developed for TPM Success.” TPM Report 1(5): 3-5.
Productivity, Inc. (2000). “4 TPM Skills Operators Must Have to Understand Their Equipment.” TPM Report 1(8): 8.
Productivity, Inc. (2000). “The Lean-TPM Connection.” TPM Report 2(2): 7-10.
Productivity_Press_Development_Team (1996). 5S for Operators: 5 Pillars of the Visual Workplace. Portland, OR, Productivity Press.
Riis, J., J. Luxhoj, et al. (1997). “A Situational Maintenance Model.” International Journal of Qualityand Reliability Management 14(4): 349-366.
Robinson, C. J. and A. P. Ginder (1995). Implementing TPM: The North American Experience. Portland, OR, Productivity Press.
Schonberger, R. J. (1986). World Class Manufacturing: The Lessons of Simplicity Applied. NewYork, The Free Press.
Sekine, K. and K. Arai (1992). TPM for the Lean Factory - Innovative Methods and Worksheets for Equipment Management. Portland, OR, Productivity Press.
SEMI (2000). SEMI E79 Specification for Definition and Measurement of Equipment Productivity. San Jose, CA, Semiconductor Equipment and Materials International.
SEMI (2001). SEMI E10 Standard for Definition and Measurement of Equipment Reliability, Availability, and Maintainability (RAM). San Jose, CA, Semiconductor Equipment and Materials International.
SEMI (2003). SEMI E124: Provisional Guide for Definition and Calculation of Overall Factory Efficiency (OFE) and Other Associated Factory-Level Productivity Metrics. San Jose, SEMI.
Semiconductor_Industry_Association (2002). International Technology Roadmap for Semiconductors: 2002 Update. San Jose CA, Semiconductor Industry Association.
Senge, P. M. (1990). The Fifth Discipline: The Art & Practice of the Learning Organization. NewYork, NY, Doubleday Currency.
Shingo, S. (1982). The Sayings of Shigeo Shingo: Key Strategies for Plant Improvement. Cambridge, MA, Productivity Press.
Shirose, K. (1992). TPM for Operators. Portland, OR, Productivity Press.
Shirose, K., Ed. (1996). TPM-Total Productive Maintenance: New Implementation Program inFabrication and Assembly Industries. Tokyo, Japan, Japan Institute of Plant Maintenance.
Society_of_Manufacturing_Engineers (1995). Total Productive Maintenance in America. Dearborn, MI, Society of Manufacturing Engineers.
Steinbacher, H. R. and N. L. Steinbacher (1993). TPM for America: What It Is and Why You Need It. Cambridge, MA, Productivity Press.
Studebaker, D. (1996). A Cultural Evolution - TPM at AMD. SEMATECH TPM/OEE Case Study Workshop, Tempe, AZ, SEMATECH.
Suehiro, K. (1987). Eliminating Minor Stoppages on Automated Lines. Portland, OR, ProductivityPress.
Suzuki, T., Ed. (1994). TPM in Process Industries. Portland, OR, Productivity Press.Tajiri, M. and F. Gotoh (1992). TPM Implementation - A Japanese Approach. New York, McGrawHill.
Takahashi, Y. and T. Osada (1990). TPM: Total Productive Maintenance. Tokyo, Asian ProductivityOrganization.
Takahasi, S. (1998). “Incorporating ISO into TPM to Perform Unified Activity!” JIPM TPM 7: 21-24.
Takeuchi (2001). “The Role of Condition Diagnostic Techniques in Manufacturing Management in the New Century.” JIPM TPM 22: 9-14.
Tan, J. M., C. S. Hoh, et al. (2003). TPM Interview - Fairchild Penang. T. Pomorski. Penang, Malaysia.
Taylor, F. W. (1911). The Principles of Scientific Management.
Taylor, F. W. (1911). Shop Management. New York, NY, Harper.
Thomas, P. (2003). TPM Interview. Austin, TX.
Thomas, P. (2003). TPM/Productivity Improvement at Advanced Micro Devices Fab 25. Austin, TX, Advanced Micro Devices.
Upton, D. M. (1995). “What Really Makes Factories Flexible?” Harvard Business Review: 74-86.
Vadas, D. and P. Walker (2003). Closing the AEM/CMMS Loop by Using Xsite with the APF Suite. Brooks Automation World-Wide Automation Symposium 2003, Phoenix, AZ.
Volkert, P. and B. Farrow (2000). Orchestrating the Pillars of TPM. 11th Total Productive Maintenance Conference and Exposition, Dallas, TX, Productivity, Inc.
Waeyenbergh, G. and L. Pintelon (2002). “A Framework for Maintenance Concept Development. ”International Journal of Production Economics 77: 299-313.
Wang, F. K. and W. Lee (2001). “Learning Curve Analysis in Total Productive Maintenance.” Omega The International Journal of Maintenance Science (29): 491-499.
Willmott, P. (1994). Total Productive Maintenance: The Western Way. Oxford, England, Butterworth-Heinemann, LTD.
Wireman, T. (1991). Total Productive Maintenance - An American Approach. New York, Industrial Press.
Yeomans, M. and P. Millington (1997). Getting Maintenance into TPM. Manufacturing Engineer: 170-173.