Definition
Goals
Benefits
TPM 8 Pillars
TPM step-by-step
Kick-off and Model Area Phase
TPM Step-by-Step
TPM Assessment
Key Pillars and Special Topics
Maintenance Management
Public Training
In-house Training
TPM Training Package
TPM Thai articles
TPM Worldwide articles
Productivity
Others
IE Technique
Productivity Improvement
5s
Just-in-Time (JIT)
PMII Web Application
TQM
TPM Tag
Form & Checksheet
Software Development
Condition-based Maintenance Tools
Training Materials
Contact Us
OEE WORKSHOP AND ASSESSMENT
Links
Promotion and Practice Phase
Stabilization and Appling to Award
Introduction to TPM
Root Cause Analysis & Corrective Action
LCC analysis for decision making
Strategic Cost Reduction
Cost reduction technique
TPM for Manager
Practical TPM
Strategic TPM Leadership for Pillar Manager
CIMCO-CMMS
Overall Equipment Effectiveness (OEE)
TPM Train the Trainer
TPM Training & Follow-up
TPM and Corporate KPIs
Effective TPM Coordinator
Modern Maintenance Management: MMM
Maintenance Budget Planning and Control
How to Audit TPM Effectively
Strategic Production Management
Production Efficiency Improvement
Manufacturing Strategy Map & KPIs
Customized In-house Training and Workshop
EFFECTIVE TPM FACILITATOR (COORDINATOR) (NEW)
HOW TO AUDIT AM EFFECTIVELY
MAINTENANCE MANAGEMENT & SPAREPART CONTROL
OEE Workshop and Assessment
TPM FOR MANAGER (NEW)
TPM FOR SUPERVISOR
MAINTENANCE COST BUDGET PLANNING AND CONTROL
Modern Maintenance Practice
Strategic Plant Reliability & Maintenance Manageme
TPM: The Success Factors
HOW TO START TPM EFFECTIVELY
Strategic Cost Reduction
INTENSIVE 4-DAYS TPM TRAINING & FOLLOW-UP
PRACTICAL TPM
Individual Improvement (Kobestsu Kaizen)
Autonomous Maintenance (Jishu-Hozen)
Planned Maintenance
TPM-KM (TPM Knowledge Management)
Initial-Phase Management
Quality Maintenance
Office TPM
AUTONOMOUS MAINTENANCE FOR THE OEE IMPROVEMENT
INTRODUCTION TO TPM AND AUTONOMOUS MAINTENANCE
KOBETSU KAIZEN AND JISHU HOZEN
TPM PILLARS ASSESSMSNT
AUTONOMOUS MAINTENANCE
OVERALL INSPECTION
QUALITY MAINTENANCE
LCC & MP Design
Practical 5S
Effective 5Ss Facilitator
How to Audit 5Ss Fairly and Effectively
Visual Control and Poka - Yoke
Superior Working Team
Effective Meeting and Communication
Effective Problem Solving for Manager
Basic Supervisory Skill
Advanced Supervisory Skill
Multi-skill Supervisor
Traditional and New 7 QC Tools
P-M and Why-why Analysis: An Advanced Step to Zero
DOE: Design of Experiment
MSA: Measurement System Analysis
SPC: Statistical Process Control
PM: Preventive Maintenance
PREDICTIVE MAINTENANCE
DESIGN OF EXPERIMENT: THE DOE TRAINING & FOLLOW-UP
ANOVA by MINITAB & SPSS
CROSS FUNCTIONAL ALIGNMENT
การแก้ไขและป้องกันปัญหาคุณภาพในกระบวนการผลิตด้วยกา
EFFECTIVE 5S IMPLEMENTATION
EFFECTIVE PROBLEM SOLVING
P-M ANALYSIS
POKA-YOKE
TPM VISUAL CONTROL
TPM VISUAL CONTROL
INITIAL PHASE MANAGEMENT
Machine Life Cycle Costing (LCC)
Root Cause Analysis & Corrective Action
FAILURE MODE & EFFECTS ANALYSIS (FMEA)
Lean Management
TQM in Action
Easy Six Sigma
Productivity Tools and Technique
Total Energy Conservation
Bottom-up Activity
JIT
Project Management
EFFECTIVE MANAGERIAL SKILL
PRACTICAL IE FOR MANAGER
EFFECTIVE COST REDUCTION TECHNIQUES
6S AUDIT (5S EFFECTIVELY)
TPM Consulting Package
In-house Training / TPM 8 Pillars
TPM Tools and Technique
TPM Related
  Lean Diagnosis  
   


 
LEAN MANUFACTURING DIAGNOSIS

Introduction
Lean Manufacturing can be defined as: "A systematic approach to identifying and eliminating waste (non-value-added activities) through continuous improvement by following the product at the pull of the customer in pursuit of perfection."

Lean Manufacturing, also called Lean Production, is a set of tools and methodologies that aims for the continuous elimination of all waste in the production process. The main benefits of this are lower production costs; increased output and shorter production lead times. More specifically, some of the goals include:

 

  • Defects and wastage
  • Cycle Times
  • Inventory levels
  • Labor productivity
  • Utilization of equipment and space
  • Flexibility
  • Output

Agenda

Date

Time

Activity

.........

0900-1200

Lean Awareness Training    

  • Lean Manufacturing Concept and Objectives
  • Wastes and Non-value added activity in Production Lines
  • The 5 Principles of Lean
  • Methodology for Identifying Wastes and Non-value added activity
  • Methodology for Eliminating  Wastes and Non-value added activity 

1300-1600

Lean Diagnosis  

  • Wastes and Non-value added activity Diagnosis
    • Workplace Organization
    • Material Flow
    • Changeover
    • Error-free Processing

Deliverables

  • Diagnosis Report with Further Recommendations
  • Lean Manufacturing Implementation Proposal


In-house Training
ติดต่อ Administrator         หากต้องการให้ติดต่อกลับสามารถ Click ที่นี่ เพื่อฝากเบอร์โทร / Fax หรือ e-mail
E-mail : admin@tpmconsulting.org
Tel. 02-207-2698 / 089-762-4079
Fax. 02-939-3588